Speck 90/230 running cost
About $726.20 a year in New South Wales (Ausgrid) at 33.14c/kWh, from its official Energy Rating (AU/NZ) figure. Change the area or usage below.
- Registry
- Energy Rating (AU/NZ)
- Efficiency
- 1star
- Energy
- 2,192 kWh/yr
Running a Speck 90/230 pool pump in New South Wales (Ausgrid) costs 33.1c per hour
at 33.14c/kWh · Australian Energy Regulator
- per day
- $1.99
- per week
- $13.92
- per month
- $60.52
- per year
- $726.20
- over 5 years
- $3,631.01
- over 10 years
- $7,262.02
- Energy / year
- 2,192 kWh
How we calculated it
1,000 W × 6 h × 33.14c/kWh = $1.99 a day
Energy figure from the official registry record.
Standing charge of $607.15 a year is paid regardless of use and isn't included.
Spec sheet
Official figures
Speck 90/230
Official figures · Energy Rating (AU/NZ)
- Annual energy consumption
- 1,243.9 kWh/year
- On-mode power
- 1,000 W
- Capacity / size
- 1,000 W
- Test standard
- AS/NZS (Energy Rating label)
- Markets
- AU
- Pump Type
- Single speed
- Energy Rating stars
- 1
- Registration number
- APP0304
- Label daily run time (h)
- 4.1
- Weighted Energy Factor
- 14.7
View the official Energy Rating (AU/NZ) record ↗Record 90230
Sources
Data source and date
Electricity price
33.14c/kWh
AER Default Market Offer (flat rate) · New South Wales (Ausgrid) · 1 July 2026 – 30 June 2027
Includes taxes.
Caps are the maximum a retailer can charge on the standing offer; market offers are often cheaper.
Australian Energy Regulator ↗ · retrieved 22 October 2026
Energy figure
Energy Rating (AU/NZ) record 90230 ↗ · AS/NZS (Energy Rating label) · retrieved October 23, 2026. Figures come from standardised tests; your use may differ — adjust the calculator.
Data as of October 22, 2026. Estimates, not a bill. WattCost is independent and not affiliated with any government, registry or utility.
Alternatives
Cheaper to run: similar pool pumps
- Hayward PLDI100VSP490 kWh/yr5stars800 W$580.96a yearPosition among comparable models
- Hayward SFP3011DIVSP490 kWh/yr5stars800 W$580.96a yearPosition among comparable models
- Hayward SP3011DIVSP490 kWh/yr5stars800 W$580.96a yearPosition among comparable models
- Neptune NPP7501,100 kWh/yr1.5stars800 W$580.96a yearPosition among comparable models
- Neptune NPE1100399 kWh/yr6stars800 W$580.96a yearPosition among comparable models
- Neptune NPX1100412 kWh/yr6stars800 W$580.96a yearPosition among comparable models
By region
Running cost across Australia
| state | Price | Per month | Per year |
|---|---|---|---|
| Victoria — CitiPower | 25.96c/kWh | $47.41 | $568.91 |
| Victoria — United Energy | 27.35c/kWh | $49.95 | $599.38 |
| Victoria — Jemena | 27.47c/kWh | $50.17 | $602.01 |
| Tasmania | 27.95c/kWh | $51.05 | $612.61 |
| Queensland — Energex (South East Queensland) | 27.97c/kWh | $51.09 | $613.06 |
| Victoria — Powercor | 28.22c/kWh | $51.54 | $618.44 |
| Northern Territory | 31.68c/kWh | $57.85 | $694.24 |
| Victoria — AusNet Services | 31.98c/kWh | $58.40 | $700.84 |
| New South Wales — Ausgrid | 33.14c/kWh | $60.52 | $726.20 |
| Western Australia | 33.26c/kWh | $60.74 | $728.94 |
| New South Wales — Endeavour Energy | 33.73c/kWh | $61.59 | $739.13 |
| New South Wales — Essential Energy | 35.01c/kWh | $63.93 | $767.14 |
| Australian Capital Territory | 36.95c/kWh | $67.49 | $809.84 |
| South Australia — SA Power Networks | 41.91c/kWh | $76.54 | $918.46 |
FAQ
Questions
How much does the Speck 90/230 cost to run?
About $726.20 a year ($60.52 a month) at 33.14c/kWh in New South Wales (Ausgrid), using its official Energy Rating (AU/NZ) figure and default usage.
Where does the energy figure come from?
From the Energy Rating (AU/NZ) record 90230, measured under AS/NZS (Energy Rating label). Real-world use depends on how you use the appliance.
Is there a cheaper-to-run alternative?
Yes — for example the Hayward PLDI100VSP costs about $580.96 a year under the same assumptions.