Skip to content
WattCost

2025 Mercedes-Benz EQE 350 4matic (SUV) charging cost in South East England

Home charging cost from its official EPA (FuelEconomy.gov) consumption of 42.0 kWh/100 mi and Ofgem electricity prices.

Registry
FuelEconomy.gov
Consumption
42.0 kWh/100 mi
Test data
Based on US

Charging a 2025 Mercedes-Benz EQE 350 4matic (SUV) in South East England

Cost per 100 mi: £11.29per 100 miles

at 26.88p/kWh · EPA combined 42.0 kWh/100 mi

Per mile
11.3p
Per month
£94.08
Per year
£1,128.96
Energy / year
4,200 kWh

How we calculated it

10,000 mi × 42 kWh/100 mi × 26.88p/kWh = £1,128.96/yr

Official consumption is measured at the wall, so normal charging losses are included. Add extra losses for cold weather or slow 120 V charging.

Your driving

The default is a round number, not a national average — enter your own.

Leave empty to price all charging at home.

Your area and home price

Optional: copy the unit rate from your bill (tax included) to replace the published price.

Sources

Data source and date

Electricity price

26.88p/kWh

Ofgem energy price cap (Direct Debit) · South East England · 1 October 2026 – 31 December 2026

Includes taxes.

No VAT is charged on domestic electricity from 1 October 2026 to 31 March 2027 (Ofgem); gas prices include 5% VAT. Multi-rate variants show Ofgem’s average unit-rate cap, not separate peak/off-peak rates.

Ofgem ↗ · retrieved 22 October 2026

Energy figure

FuelEconomy.gov record 48394 ↗ · EPA label (FTP/HWFET, 5-cycle adjusted), measured from the wall · retrieved October 23, 2026. Figures come from standardised tests; your use may differ — adjust the calculator.

Data as of October 22, 2026. Estimates, not a bill. WattCost is independent and not affiliated with any government, registry or utility.

Spec sheet

Official figures

2025 Mercedes-Benz EQE 350 4matic (SUV)

Official figures · FuelEconomy.gov

Consumption
26.1 kWh/100 km
Per 100 miles
42.0 kWh
EPA range (miles)
253
Year
2025
Drive
All-Wheel Drive
Motor
71 and 144 kW ACPM 6-Phase
Manufacturer
MBX
EPA vehicle class
Standard Sport Utility Vehicle 4WD
Charge time at 240 V (hours)
10.8
City (kWh/100 mi)
40
Highway (kWh/100 mi)
43

View the official FuelEconomy.gov record ↗Record 48394

By region

Charging cost by region

AreaPricePer 100Per year
East Midlands25.36p/kWh£10.65 / mi£1,065.12
North East England25.46p/kWh£10.69 / mi£1,069.32
Yorkshire25.60p/kWh£10.75 / mi£1,075.20
West Midlands25.60p/kWh£10.75 / mi£1,075.20
South Scotland26.11p/kWh£10.97 / mi£1,096.62
North Scotland26.35p/kWh£11.07 / mi£1,106.70
Southern England26.47p/kWh£11.12 / mi£1,111.74
North West England26.49p/kWh£11.13 / mi£1,112.58
South Wales26.55p/kWh£11.15 / mi£1,115.10
South West England26.58p/kWh£11.16 / mi£1,116.36
London26.60p/kWh£11.17 / mi£1,117.20
East of England26.61p/kWh£11.18 / mi£1,117.62
South East England26.88p/kWh£11.29 / mi£1,128.96
Merseyside and North Wales27.86p/kWh£11.70 / mi£1,170.12

Per year assumes 10,000 miles of home charging.

By country

Charging cost by country

Alternatives

More efficient electric cars

FAQ

Questions

How much does it cost to charge a 2025 Mercedes-Benz EQE 350 4matic (SUV) in South East England?

About £11.29 per 100 mi at 26.88p/kWh (Ofgem energy price cap), using its official consumption of 42.0 kWh/100 mi.

Do official figures include charging losses?

Yes. EPA and WLTP electricity consumption are measured as energy drawn from the wall, so normal charger losses are included. Cold weather, motorway speeds and slow 120 V charging can raise real-world use — add extra losses in the calculator.

What about public charging?

Rapid public chargers usually cost more per kWh than home electricity. Enter your public price and the share of charging you do away from home to blend them.